T.O.C |
Table
of Contents
|
|
| |
|
|
| |
|
|
| |
CONTENTS
- VOLUME I |
|
Section
1 |
General
(Policy and Procedure) |
|
|
|
1-0 |
Routine
Screening and Updating of Memos and Manuals (Metric) |
Mar
1998 |
|
|
1-0
Attachment A |
|
Memo
Responsibility (Metric) |
Mar
1998 |
|
|
1-1 |
Division
of Structures - Organization Chart |
May
1993 |
|
|
1-2 |
Structure
Design Technical Committee |
Dec
1998 |
|
|
1-2
Attachment 1
|
|
Structure
Design Technical Committee |
Dec
1998 |
|
|
1-2
Attachment 2 |
|
Individual
Technical Specialists |
Dec
1998 |
|
|
1-2
Attachment 3 |
|
Individual
Technical Committee |
Sep
1993 |
|
|
1-3 |
Checking
Procedure |
Jan
1989 |
|
|
1-3
Attachment A |
|
Checking
Procedure |
Jan
1989 |
|
|
1-4 |
Estimated
Design Hours for Bridges and Related Structures |
Apr
1992 |
|
|
1-4
Attachment A |
|
Estimated
Design Hours |
Apr
1992 |
|
|
1-5 |
Distribution
of Plans |
Dec
1994/Apr 1996 |
|
|
1-5
Attachment A |
|
Distribution
of Unchecked Details for
Earth Retaining Systems <<Interim |
Oct
2005 |
|
|
1-6 |
Retention
of Project Records |
Apr
1991 |
|
|
1-6
Attachment A |
|
Computer
File Archive Worksheet (Example) |
Apr
1991 |
|
|
1-7 |
Retention
of Standard Sheet Backup Date |
Dec
1990 |
|
|
1-7
Attachment A |
|
Location
of Backup Calculations for Standard Sheet (Form)
|
Dec
1990 |
|
|
1-8 |
Advance
Planning Studies |
Aug
1992 |
|
|
1-8
Attachment A |
|
Example
|
Mar
1991 |
|
|
1-10 |
Considering
Bridge Security During Design (Metric) |
Aug
2004 |
|
|
1-11 |
Stage
Construction Future Widenings |
Jul
1989 |
|
|
1-11
Attachment A |
|
Provision
for future Widening |
Jul
1989 |
|
|
1-13 |
Disposition
of Plans Specifications and Estimates (PS & E) |
Mar
1989 |
|
|
1-13
Attachment |
|
Form
DPD - SD51 (Rev 5/78) |
Mar
1989 |
|
|
1-15 |
Telephone
Calls from Contractors and Suppliers |
Jan
1999 |
|
|
1-16
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 1 |
|
Release
of Structure's Electronic Contract PlanFiles (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 2A |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 2B |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 2C |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 2D |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 2E |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 3A |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 3B |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 3C |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-16
Attachment 3D |
|
Release
of Structure's Electronic Contract Plan Files (After Award)(Metric) |
Mar
2002 |
|
|
1-20 |
''As
Built Plans'' for Bridges and Structures |
Nov
1988 |
|
|
1-20
Attachment 1 |
|
Procedure
on ''As Builts'' for State PS & E Bridge and Structures |
Nov
1988 |
|
|
1-20
Attachment 2 |
|
Procedure
on ''As Builts'' for Local Agency PS & E Bridge and Structures
|
Nov
1988 |
|
|
1-21 |
Bridge "As Built Plans" Changes<<(Coming soon) |
Oct
1992 |
|
|
1-21
Attachment A |
|
Form
DS-D0011<<(Coming soon) |
Oct
1992 |
|
|
1-22 |
Scheduling
Graph |
Apr
1989 |
|
|
1-22
Attachment |
|
Office
of Structure Design Scheduling Bridge Projects |
Apr
1989 |
|
|
1-23 |
Hydraulic
and Hydrologic Data (Metric) |
Oct
2003 |
| |
|
Lightweight Masonry Approved for Use on Structures |
Oct
2003 |
| |
|
Caltrans Bridge Design Specifications, Section 2.7.3.2.1 |
Sep
2003 |
|
|
1-29 |
Type
Selection Review Meeting (Metric) |
Jul
2001
|
|
|
1-29
Attachment 1 |
|
Structure
Type Selection (Metric)
|
Jul
2001 |
|
|
1-29
Attachment 2 |
|
Request
for Type Selection Meeting (Metric) |
Jul
2001 |
|
|
1-29
Attachment 3 |
|
Type
Selection Memo (Metric) |
Jul
2001 |
|
|
1-29
Attachment 4 |
|
Type
Selection Recommendations (Metric) |
Jul
2001 |
|
|
1-29
Attachment 5 |
|
Type
Selection Review Meeting for Earth
Retaining Structures (Metric)
<<Interim |
Oct
2005 |
|
|
1-31 |
Constructability Reviews For Structures Projects |
Oct
2009 |
|
1-31
Attachment 1 |
|
Constructability Reviews For Structures Projects |
Oct
2009 |
|
1-32 |
Use
of Trade Names in Plans and Specifications (Metric) |
Jan
1999 |
|
|
1-32
Attachment 1 |
|
Policy
For Using Trade Names - (from PS & E Guide)(Metric) |
Jan
1999 |
|
|
1-35 |
Foundation
Data (Metric) |
Mar
1998 |
|
1-35 |
Foundation Recommendation And Reports |
Jun 2008 |
|
|
1-35
Attachment A |
|
Earth
Retaining Structure Foundation Review
<<Interim
|
Nov
2004 |
|
|
1-36 |
Structure
Project Engineer's Responsibility for Monitoring Delivery of PS
& E Packages |
Mar
1991 |
|
|
1-37 |
Duties
of Project Designer |
Apr
1995 |
|
|
1-38 |
Project
Administrative Records |
May
1989 |
|
|
1-38
Attachment A |
|
Correspondence
Record |
May
1989 |
|
|
1-38
Attachment B |
|
Telephone
Memo |
May
1989 |
|
|
1-38
Attachment C |
|
Project
Engineer's Checklist |
May
1989 |
|
|
1-38
Attachment D |
|
Print
Distribution |
May
1989 |
|
|
1-38
Attachment E |
|
Historical
Cost Record |
May
1989 |
|
|
1-38
Attachment F |
|
Check
List (Final Check on Completed Sets) |
May
1989 |
|
|
1-38
Attachment G |
|
Check
List (Check on Road Plans) |
May
1989 |
|
|
1-39
|
Communication
with Field Personnel |
May
1989 |
|
|
1-45 |
Availability
of Structure Slides |
Feb
1989 |
|
|
1-46 |
Process
for Establishing Depth of Footing to Compensate for Expected Scour |
Feb
1990 |
|
1-47 |
General Notes |
Apr
2010 |
|
1-47 Attachment 1 |
Load Factor Design or Load and Resistance Factor Design |
Aug 2010 |
|
1-47 Attachment 2 |
Preface to California Amendments, 4th Ed. Amended Articles |
Sep 2009 |
| |
|
|
|
|
|
| |
|
|
Section
2 |
Plan
Preparation |
|
|
|
2-1 |
Detailing
Contract Plans in Metric |
Apr
1996 |
|
|
2-1
Attachment A |
|
Preferred
Metric Scale |
Apr
1996 |
|
|
2-2 |
Deck
Contour (Metric) |
Jan
1999 |
|
|
2-2
Attachment 1 |
|
From
DS-D134 (Rev 12/88)(Metric) |
Jan
1999 |
|
|
2-11 |
Bridge
Numbering System |
Feb
1993 |
|
|
2-11 |
Bridge
Numbering System (Metric) |
May
1996 |
| |
2-12 |
Implementation Memo |
Oct 2012 |
| |
2-12 |
Special Design Earth Retaining Systems Numbering |
Oct 2012 |
|
2-12
Attachment A |
|
Request for Earth
Retaining Structures Bridge Number <ERSBrNo Form> |
Oct
2012 |
|
|
2-25 |
Review
of Road Plans |
May
1989 |
|
|
2-25
Attachment |
|
Routing
and Transmittal of Road Plans |
May
1989 |
|
|
|
| |
|
|
Section
3 |
Piles |
|
|
|
3-0 |
Pile
Foundation Design |
Mar
1989 |
|
|
3-1 |
Deep
Foundations (Metric) |
Jan
2001 |
|
3-1 |
Deep
Foundations |
Jul
2008 |
|
|
3-1
Attachment 1 |
|
Pile
Data Table (Metric) |
Jan
2001 |
|
3-1
Attachment 1 |
|
Design Procedure and Examples |
Jul
2008 |
|
|
3-1
Attachment 2 |
|
CIDH
Inspection Piles (Metric) |
Jan
2001 |
|
3-1
Attachment 2 |
|
CIDH
Inspection Piles |
Jul
2008 |
|
|
3-1
Attachment 3 |
|
Standard
Metric Sizes (Metric) |
Jan
2001 |
|
3-1
Attachment 3 |
|
Equivalent Standard Metric Sizes |
Jul
2008 |
|
|
3-4 |
Piles
Adjacent to Existing Roadway or Private Property |
Oct
1988 |
| |
3-6 |
Large
Diameter Hollow Prestressed Driven Piles |
Oct
1988 |
| |
3-7 |
Implementation Memo |
Apr
2012 |
|
3-7 |
Design Data Documentation and Evaluation of Anomalous Concrete Shafts |
Apr
2012 |
|
3-7 Attachment 1 |
|
Shaft Design Information Forms |
Apr
2012 |
|
3-7 Attachment 2 |
|
Example of Evaluation Process |
Apr
2012 |
|
3-7 Attachment 3 |
|
Pile Design Data Form (GGL) |
Apr
2012 |
|
3-7 Attachment 4 |
|
Pile Design Data Form (CSL) |
Apr
2012 |
|
|
|
| |
|
|
Section
4 |
Footings |
|
|
|
4-1 |
Spread
Footing (Metric) |
Nov
2003 |
|
4-1 |
Spread
Footing |
Apr
2008 |
|
|
4-1
Attachment 1 |
|
Format
for the Final Foundation Report (Metric) |
Nov
2003 |
|
4-1
Attachment 1 |
|
Preliminary Foundation Design Data Sheet |
Apr
2008 |
|
4-1
Attachment 2 |
|
Foundation Design Data Sheet |
Apr
2008 |
|
4-1
Attachment 3 |
|
Spread Footing Data Tables |
Apr
2008 |
|
|
4-2 |
Superimpose
Footing Locations on Log of Test Borings Sheet |
Oct
1988 |
|
|
|
| |
|
|
Section
5 |
Abutments
and Retaining Walls |
|
|
|
5-1 |
Abutments
|
Oct
1992 |
|
|
5-1 |
Abutments
(Metric) |
May
1996 |
|
|
5-2 |
Diaphragm
Abutments |
Oct
1992 |
|
|
5-2 |
Diaphragm
Abutments (Metric) |
May
1996 |
|
|
5-3 |
Structure
Approach |
Dec
1992 |
|
|
5-3 |
Structure
Approach (Metric) |
May
1996 |
|
|
5-3
Attachment A |
|
Selection
Process for Structure Approach Pavement System on PCC Pavement (Metric) |
May
1996 |
|
|
5-3
Attachment B |
|
Selection
Process for Structure Approach Pavement System on AC Pavement (Metric) |
May
1996 |
|
|
5-7 |
Earth
Retaining System Safety Railing (Metric) |
Jan
2005 |
|
|
5-8 |
Mechanically
Stabilized Embankment |
Jan
1991 |
|
|
5-8
Attachment A |
|
Implementaton
of PS&E |
Jan
1991 |
|
|
5-8
Attachment B |
|
Outline
of Design Responsibilities |
Jan
1991 |
|
|
5-10 |
Slope
Treatment Under Structures |
Apr
1989 |
|
|
5-12 |
Earth
Retaining Structures Using Tiebacks |
July
2012 |
|
|
5-14 |
Review
of Shop Drawings for Ground Anchors |
June
2012 |
|
|
5-16 |
Review
of Working Drawings for Proprietary Earth Retaining Systems |
Apr
1992 |
|
|
5-17 |
Earth
Retaining Structures (Costs) |
Feb
1989 |
|
|
5-17
Attachment |
|
Earth
Retaining Structures (Graph) |
Feb
1989 |
|
|
5-18 |
Soil
Nail Walls |
Jan
1991 |
|
|
5-18
Attachment A |
|
Soil
Nail Working Drawings Review Process <<Interim |
Oct
2004 |
|
|
5-20 |
Foundation
Report/Geotechnical Design Report Checklist for Earth Retaining
Systems (Metric) |
Aug
2004 |
|
|
|
| |
|
|
Section
6 |
Bents
and Piers |
|
|
|
6-1 |
Column
Analysis Considerations |
Feb
2009 |
|
|
6-1 |
Column
Analysis Considerations (Metric) |
Oct
2001 |
|
|
6-5 |
Reinforced
Concrete Pier Walls (Metric) |
Feb
1999 |
|
|
6-5
Attachment 1 |
|
Percentage
and Spacing Requirements for Pier Wall Reinforcement (Metric) |
Feb
1999 |
|
|
6-5
Attachment 2 |
|
Pier
Wall Example Reinforcement for Lightly Loaded Walls (Metric) |
Feb
1999 |
|
|
|
| |
|
|
Section
7 |
Bearing
& Expansion Devices |
|
|
|
7-1 |
Bridge
Bearings |
Jun
1994 |
|
|
7-1
Attachment 1 |
|
Prestress
Shortening |
Jun
1994 |
|
|
7-1
Attachment 2 |
|
Structure
for Examples 2 and 3 |
Jun
1994 |
|
|
7-1
Attachment 3 |
|
Structure
for Examples 4 and 5 |
Jun
1994 |
|
|
7-1
Attachment 4 |
|
PTFE/Spherical
Expansion Bearing Details |
Jun
1994 |
|
|
7-10 |
Bridge
Deck Joints and Deck Joint Seals |
Sep
1994 |
|
|
7-10
Attachment 1 |
|
Calculation
of Points of No Movement |
Sep
1994 |
|
|
7-10
Attachment 2 |
|
Joint
Movements Calculations |
Sep
1994 |
|
|
7-10
Attachment 3 |
|
Maximum
Contributory Structure Length |
Sep
1994 |
|
|
7-10
Attachment 4 |
|
Prestress
Shortening |
Sep
1994 |
|
|
7-10
Attachment 5 |
|
Approximate
Properties for Preformed Elastomeric Joint Seals Type B Manufacturer's
Nominal Properties for Design Data Only |
Sep
1994 |
|
|
7-10
Attachment 6 |
Typical
Alternate Joint Seal Assembly |
Sep
1994 |
|
|
7-10
Attachment 7 |
|
Size
Blockout Dimensions |
Sep
1994 |
|
|
7-10
Attachment 8 |
|
Typical
Modular Joint Seal Assembly |
Sep
1994 |
|
|
7-10
Attachment 9 |
|
Bridge
Deck Joint Rehabilitation Projects |
Sep
1994 |
|
|
|
| |
|
|
Section
8 |
Deck
Slabs |
|
|
|
8-2 |
Protection
Against Deicing Chemicals and Freeze-Thaw Environment |
Aug
1994 |
|
|
8-2
Attachment A |
|
California
State Highways Environmental Areas |
Jun
1989 |
|
|
8-2
Attachment B |
|
California
State Highway Listing by Environmental Area and Post Mile |
Jun
1989 |
|
|
8-5 |
Overlays
on Existing Bridge Decks (Metric) |
May
1996 |
|
|
8-6 |
Use
of Prestressed Concrete Deck Panel Stay-in-Place Forms |
Apr
1983 |
|
8-7 |
Permanent
Steel Deck Forms for Precast Concrete and Steel Superstructures |
Jul
1994 |
|
8-8 |
Implementation Memo |
Mar 2013 |
|
|
8-8 |
Deck Finishing and Quiet Decks |
Mar 2013 |
|
|
|
| |
|
|
Section
9 |
Existing
Bridges |
|
|
|
9-1 |
Dependent
Dimension |
Mar
1989 |
|
|
9-2 |
Maintenance
Rating |
Mar
1986 |
|
|
9-2 |
Maintenance
Rating (Metric) |
May
1996 |
|
|
9-2
Attachment 1 |
|
Standard
Permit Rating and Design Vehicles with Purple Loads |
Mar
1986 |
|
|
9-2
Attachment 1 |
|
Standard
Permit Rating and Design Vehicles with Purple Loads (Metric) |
May
1996 |
|
|
9-3 |
Widening
Existing Bridges |
May
2010 |
|
|
9-4 |
Live
Loads and Stresses Historical Background |
Jan
1986 |
|
|
9-5 |
Removal
of Existing Bridges |
May
1986 |
|
|
9-6 |
Permit
Upgrading |
Dec
1982 |
|
|
9-7 |
Strengthening
Steel Girder Bridges for Live Loads |
Sep
1989 |
|
|
9-7
Attachment A |
|
Strengthening
Steel Girder Bridges for Live Loads |
Sep
1989 |
|
|
9-8 |
Widening
Closed End Cellular Abutments (Metric) |
Feb
2002 |
|
|
|
| |
|
|
Section
10 |
Reinforced
Concrete Box Girders |
|
|
|
10-1 |
Reinforced
Concrete Strength Requirements (Metric) |
Apr
1999 |
|
|
10-5 |
Protection
of Reinforcement Against Corrosion Due to Chlorides, Acids Sulfates |
Jun
2010 |
|
10-5 |
Protection
of Reinforcement Against Corrosion Due to Chlorides, Acids Sulfates
(Metric) |
Jan
2002 |
|
|
10-6 |
Use
of Prefabricated Epoxy Coated Reinforcement in Marine Environment |
Jun
2010 |
|
10-6 |
Use
of Prefabricated Epoxy Coated Reinforcement in Marine Environment
(Metric) |
Jan
2002 |
|
10-20 |
Deck and Soffit Slabs |
May
2008 |
|
10-20
Attachment 1 |
|
Deck Slab Reinforcement Details |
Apr
2013 |
|
10-20
Attachment 2 |
|
Deck Slab Thickness and Reinforcement Schedule |
May
2008 |
|
10-20
Attachment 3 |
|
Soffit Slab Reinforcement Details |
May
2008 |
|
|
|
| |
|
|
Section
11 |
Precast
and/or Prestressed |
|
| |
11-1 |
Implementation Memo |
Apr 2013 |
|
|
11-1 |
Prestressed Concrete - Shop Drawing Review |
Apr 2013 |
|
|
11-1
Attachment A |
|
Attachment A |
Apr 2013 |
|
|
11-3 |
Designer's
Check List for Prestressed Concrete |
Nov
2010 |
|
|
11-8 |
Design
of Precast Prestressed Girders |
Mar
1994 |
|
|
11-8 |
Design
of Precast Prestressed Girders (Metric) |
Nov
1996 |
|
|
11-9 |
Economical
Precast Girders |
Mar
1994 |
|
|
11-18 |
Stressing
Incomplete Bridges |
Dec
1988 |
| |
11-25 |
Implementation Memo |
Oct
2012 |
| |
11-25 |
Anchorage Zone Design |
Oct
2012 |
|
|
11-28 11-28 |
Prestress
Clearances for Cast-In-Place Prestressed Box Girder Structures |
Oct
2010 |
| |
11-28 Attachment 1 |
|
Prestress
Clearances for Cast-In-Place Prestressed Box Girder Structures |
Jan 2013 |
| |
11-28 Attachment 2 |
|
Prestress
Clearances for Cast-In-Place Prestressed Box Girder Structures |
Oct
2010 |
| |
11-31 |
Implementation Memo |
Oct
2012 |
|
|
11-31 |
Curved
Post-Tensioned Bridges |
Oct
2012 |
| |
11-34 |
Implementation Memo |
Sep
2012 |
|
|
11-34 |
Hinge
Curl |
Sep
2012 |
|
|
|
| |
|
|
Section
12 |
Steel
|
|
| |
12-1 |
Implementation Memo |
Sep
2012 |
| |
12-1 |
Review of Shop Drawings - Steel Structures |
Sep
2012 |
| |
12-2 |
Implementation Memo |
May
2012 |
|
|
12-2 |
Guidelines
for Identification of Steel Bridge Members |
May
2012 |
|
|
12-3 |
Camber
of Steel-Concrete Composite Girders (Metric) |
Aug
2004 |
|
|
12-4 |
Criteria
for Control Dimension "Y" on Steel Girders(Metric) |
Aug
2004 |
|
|
12-5 |
Complete
Joint Penetration and Partial Joint Penetration Groove Welds (Metric) |
Aug
2004 |
|
|
12-6 |
Field Welding Near Elastometric Bearing Pads (Metric) |
Aug 2004 |
|
|
12-7 |
Catwalks
on Steel Bridges (Metric) |
Aug
2004 |
|
12-8 |
Steel Pedestrian Bridges |
Nov
2009 |
|
|
12-11 |
Galvanizing
Tanks (Metric) |
Aug
2004 |
|
|
|
| |
|
|
Section
13 |
Pedestrian
Structures |
|
|
|
13-1 |
Pedestrian Grade Separations (Overpasses and Underpasses) Compliance for the Physically Handicapped (Under Construction) |
Jun 1989 |
|
|
13-2 |
Physically Handicapped Compliance Approval (Under Construction) |
Jul 1989 |
|
|
|
| |
|
|
Section
14 |
Railings
and Barriers |
|
|
|
14-3 |
Double
Railing on Bridges |
Oct
1988 |
|
|
14-4 |
Pipe
Handrailing - Pipe Railing |
Jul
1988 |
|
|
14-6 |
Bridge
Railing Replacement |
Feb
1989 |
|
|
14-6
Attachment |
|
Bridge
Barrier and Culvert Railings |
Sep
1994 |
|
|
14-8 |
Chain
Link Fencing on Structures |
Oct
1988 |
|
|
14-10 |
MBGR
Connection to Barrier Railing Type 9, 9-11 |
May
1989 |
|
|
14-10
Attachment 1 |
|
Modified
MBGR Connection Details - Barrier Railing
Type 9 and 9-11 - Sheet 1 of 2
|
May
1989 |
|
|
14-10
Attachment 2 |
|
Modified
MBGR Connection Details - Barrier Railing
Type 9 and 9-11 - Sheet 2 of 2 |
May
1989 |
|
|
14-14 |
Crash
Cushions |
Jan
1989 |
|
|
14-14
Attachment A |
|
Crash
Cushions |
Jan
1989 |
|
|
14-14
Attachment B |
|
Design
Guide - Crash Cushion - Sand Filled -Typical Installations |
Jan
1989 |
|
|
14-14
Attachment C |
|
Vehicle
Crash Cushion Layout - Gores at Existing Structure Columns |
Jan
1989 |
|
|
14-14
Attachment D |
|
Vehicle
Crash Cushion - Hex Foam |
Jan
1989 |
|
|
14-14
Attachment E |
|
Temporary
Crash Cushion (CZ G R E A T) |
Jan
1989 |
|
|
14-19 |
Temporary
Railing |
Apr
1990 |
|
|
|
| |
|
|
Section
15 |
Structural
Analysis |
|
|
|
15-14 |
Loads
for Temporary Highway Structures |
Dec
2010 |
|
|
15-14
Attachment 1 |
|
Loads
for Temporary Highway Structures |
Dec
2010 |
|
|
15-15 |
Materials
Hauling Equipment Loading |
Feb
2007 |
|
|
15-16 |
Crane
Loads on Structures While Under Contract Administration |
Jul
1969 |
|
|
15-17 |
Future
Wearing Surface |
Dec
1988 |
|
|
15-18 |
Additional
Dead Load on Bridge Decks |
Sep
1988 |
|
|
15-20 |
Live
Load Distribution by Three Dimensional Analysis |
Jun
1988 |
|
|
15-20
Attachment A |
|
Concrete
Box Girder Live Load Distribution by Lanell
for Special Loads |
Jun
1988 |
|
|
|
| |
|
|
Section
16 |
Deflections
|
|
| |
Deleted |
May
2005 |
|
|
|
| |
|
|
Section
17 |
Railroads
|
|
|
|
17-100 |
General |
Apr
1989 |
|
|
17-101 |
Correspondence
with Railroads |
Mar
1989 |
|
|
17-102 |
Railroad
Standard Drawings |
Mar
1989 |
|
|
17-105 |
This section is under construction, please contact Raj Mangat with any questions. |
|
|
|
17-106 |
This section is under construction, please contact Raj Mangat with any questions. |
|
|
|
17-110 |
This section is under construction, please contact Raj Mangat with any questions. |
|
|
|
17-115 |
Railroad
Bridges Superstructure Depths |
Mar
1991 |
|
|
17-120 |
Special
Requirements of Railroad Companies |
Jan
1991 |
|
|
17-121 |
Western
Pacific Railroad Company |
Apr
1989 |
|
|
17-125 |
Drainage
at Overheads |
May
1989 |
|
|
17-130 |
Railroad
Live Loading and Impact |
Apr
1989 |
|
|
17-135 |
Surcharge
from Railroad Loading |
May
1989 |
|
|
17-140 |
SPT
Co Supplemental Requirements to Chapter 8 AREA Specifications |
Aug
1989 |
|
|
|
| |
|
|
Section
18 |
Drainage
and Utilities |
|
|
|
18-1 |
Bridge
Deck Drainage |
Jun
1989 |
|
|
18-1 |
Bridge
Deck Drainage (Metric) |
Sep
1996 |
|
18-1 |
Bridge
Deck Drainage |
Sep
2009 |
|
|
18-2 |
Utilities
and Openings for Future Utilities In Bridge |
Feb
1990 |
|
|
18-2 |
Utilities
and Openings for Future Utilities In Bridge (Metric) |
Jul
1996 |
|
|
18-2
Attachment |
|
Encroachments
on Bridges |
Feb
1990 |
|
|
18-2
Attachment |
|
Encroachments
on Bridges (Metric) |
Jul
1996 |
|
|
18-3 |
Supply
Lines, Communication Conduit and Sprinkler Control Conduit on
Bridges |
Dec
1990 |
|
|
|
| |
|
|
Section
19 |
Estimating
|
|
| |
No
Items Are Currently In This Section |
|
|
|
|
| |
|
|
Section
20 |
Seismic |
|
|
20-1 |
Seismic
Design Methodology |
July
2010 |
|
20-1 Attachment 1 |
Seismic
References |
July
2010 |
|
|
20-2 |
Site Seismicity
for Temporary Bridge and Stage Construction |
May
2011 |
|
20-3 |
Restrainers
at Support Joints |
Jul
2008 |
|
20-4 |
Seismic
Retrofit Guidelines for Bridges in California |
Jun 2010 |
|
|
20-4
Attachment A |
|
Seismic
Retrofit Guidelines for Bridges in California |
Jun 2010 |
|
|
20-5 |
Identifying
Seismic Design Criteria In The General Notes |
May
2010 |
|
|
20-6 |
Seismic
Strength of Concrete Bridge Superstructures |
Aug
2001 |
|
|
20-6
Attachment 1 |
|
Demand
Procedure (Metric) |
Aug
2001 |
|
|
20-6
Attachment 2 |
|
Capacity
Procedure (Metric) |
Aug
2001 |
| |
20-8 |
Analysis of Ordinary Bridges that Cross Faults |
Jan
2013 |
|
|
20-9 |
Splices
in Bar Reinforcing Steel (Metric) |
Aug
2001 |
|
|
20-9
Attachment 1 |
|
Strain
Requirements in an Ultimate Splice (Metric) |
Aug
2001 |
| |
20-10 |
Implementation Memo |
Mar 2013 |
| |
20-10 |
Fault Rupture |
Jan 2013 |
|
|
20-11 |
Establishing
Bridge Seismic Design Criteria (Metric) |
Jan
1999 |
| |
20-12 |
Implementation Memo |
Mar 2013 |
|
|
20-12 |
Seismic Design Criteria for Bridge Widenings |
Apr
2013 |
| |
20-13 |
Tsunami Hazard Guidlines |
Jan
2010 |
| |
20-14 |
Quantifying the Impacts of Soil Liquefaction and Lateral Spreading on Project Delivery |
Jul
2008 |
|
20-14
Attachment 1 |
|
Quantifying the Impacts of Soil Liquefaction and Lateral Spreading on Project Delivery |
Jul
2008 |
| |
20-15 |
Soil Liquefaction and Lateral Spreading Analysis Guidelines |
Jul
2008 |
|
20-15
Attachment 1 |
|
Analysis Details For Bents |
Jul
2008 |
| |
20-16 |
Seismic Safety Peer Review |
Jun
2009 |
| |
|
|
|
|
|
Section
21 |
Miscellaneous |
|
|
|
21-19 |
Guidelines
for Clearance to Construction Operations |
Mar
1989 |
|
|
21-19 |
Guidelines
for Clearance to Construction Operations (Metric) |
Jul
1996 |
|
|
21-19
Attachment 1 |
|
Footing
Excavation |
Mar
1989 |
|
|
21-19
Attachment 1 |
|
Footing
Excavation (Metric) |
Jul
1996 |
|
|
21-19
Attachment 2 |
|
Pile
Driving and Drilling Small CIDH Piles |
Mar
1989 |
|
|
21-19
Attachment 2 |
|
Pile
Driving and Drilling Small CIDH Piles (Metric) |
Jul
1996 |
|
|
21-19
Attachment 3 |
|
Column
Construction |
Mar
1989 |
|
|
21-19
Attachment 3 |
|
Column
Construction (Metric) |
Jul
1996 |
|
|
21-35 |
Limits
of Widths of Bridge Superstructures |
Nov
1988 |
|
|
21-35 |
Limits
of Widths of Bridge Superstructures (Metric) |
Jul
1996 |
|
|
21-47 |
Lightweight
Concrete |
Mar
1986 |
|
|
21-52 |
Architectural
Treatment of Walls and Columns |
Sep
1993 |
|
|
21-52
Attachment 1 |
|
Architectural
Treatment of Walls and Columns |
Sep
1993 |
| |
|
|
|
|
|
Section
22 |
Sound
Wall |
|
|
|
22-1 |
Sound
Wall Design Criteria (Metric) |
Aug
2004 |
|
|
22-2 |
Soundwall
Load Distribution (Metric) |
Feb
2004 |
|
|
22-5 |
Sound
Wall Plans Format for Projects by Office of Structure Design |
Nov
1988 |
|
|
22-10 |
Instructions
for Using Standard Sound Wall Masonry Block Detail Sheets |
Jun
1989 |
|
|
22-10
Attachment |
|
Instructions
for Using Standard Sound Wall
Detail Sheets - Masonry Block |
Jun
1989 |
|
|
22-20 |
Instructions
for Using Standard Sound Wall Precast Concrete Panel Detail Sheets |
Jun
1989 |
|
|
22-20
Attachment |
|
Instructions
for Using Standard Sound Wall
Detail Sheets - Precast Concrete Panel |
Jun
1989 |
|
|
22-25 |
Instructions
for Using Standard Sound Wall-Wood Plank,Plywood Sheet and Framed
Plywood Panel Detail Sheets |
Jun
1989 |
|
|
22-25
Attachment |
|
Instructions
for Using Standard Sound Wall Detail
Sheets - Wood Plank, Plywood Sheet and
Framed Plywood Panel |
Jun
1989 |
|
|
22-30 |
Instructions
for Using Standard Sound Wall-Composite Plaster Panel Detail Sheets |
Jun
1989 |
|
|
22-30
Attachment |
|
Instructions
for Using Standard Sound Wall Detail
Sheets - Composite Plaster Panel |
Jun
1989 |
|
|
22-35 |
Instructions
for Using Standard Sound Wall Ribbed Steel Panels Detail Sheets |
Jun
1989 |
|
|
22-35
Attachment |
|
Instructions
for Using Standard Sound Wall
Detail Sheets - Ribbed Steel Panels |
Jun
1989 |
|
|
22-50 |
Sound
Wall - Concrete Masonry Blocks |
Dec
1988 |
|
|
22-55 |
Sound
Wall - Design Weight - Concrete Masonry Block |
Nov
1988 |
| |
|
|
|
|
|
Section
23 |
Underground
Structures |
|
|
|
23-1 |
Reinforced
Concrete Box Culvert Design |
Dec
1992 |
|
|
23-1 |
Reinforced
Concrete Box Culvert Design (Metric) |
Mar
1998 |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|