Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 07-3W1904
Date Adv.: 03/13/2017

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1070030LEAD COMPLIANCE PLANLSLUMP SUM
2120090CONSTRUCTION AREA SIGNSLSLUMP SUM
3120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
4130100JOB SITE MANAGEMENTLSLUMP SUM
5130200PREPARE WATER POLLUTION CONTROL PROGRAMLSLUMP SUM
6130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
7141103REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE)LF2,410
8480300TEMPORARY SUPPORTLSLUMP SUM
9(F)510053STRUCTURAL CONCRETE, BRIDGECY3.5
10511106DRILL AND BOND DOWELLF46
11511118CLEAN EXPANSION JOINTLF1,115
12519081JOINT SEAL (MR 1/2")LF415
13519088JOINT SEAL (MR 1")LF141
14519091JOINT SEAL (MR 1 1/2")LF326
15519100JOINT SEAL (MR 2")LF233
16(F)520102BAR REINFORCING STEEL (BRIDGE)LB170
17600001PUBLIC SAFETY PLANLSLUMP SUM
18600011RAPID SETTING CONCRETE (PATCH)CF5
19600013REPAIR SPALLED SURFACE AREASQFT14
20600033REMOVE UNSOUND CONCRETECF5
21600035POLYESTER CONCRETE EXPANSION DAMCF6
22600037PREPARE CONCRETE BRIDGE DECK SURFACESQFT146,265
23(F)600045TREAT BRIDGE DECKSQFT146,265
24600047FURNISH BRIDGE DECK TREATMENT MATERIALGAL1,831
25600115BRIDGE REMOVAL (PORTION), LOCATION ALSLUMP SUM
26600116BRIDGE REMOVAL (PORTION), LOCATION BLSLUMP SUM
27600117BRIDGE REMOVAL (PORTION), LOCATION CLSLUMP SUM
28045758PRESTRESSING STRAND SPLICE ASSEMBLY (GRABB-IT CABLE SPLICE)EA3
29(F)750505BRIDGE DECK DRAINAGE SYSTEMLB72
30810120REMOVE PAVEMENT MARKEREA500
31810220PAVEMENT MARKER (NON-REFLECTIVE)EA290
32810230PAVEMENT MARKER (RETROREFLECTIVE)EA220
33833128CONCRETE BARRIER (TYPE 25 MODIFIED)LF3
348405044" THERMOPLASTIC TRAFFIC STRIPELF4,740
358405068" THERMOPLASTIC TRAFFIC STRIPELF630
36840515THERMOPLASTIC PAVEMENT MARKINGSQFT120
378405254" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12)LF2,530
388405264" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7)LF1,550
39846030REMOVE THERMOPLASTIC TRAFFIC STRIPELF4,050
40846035REMOVE THERMOPLASTIC PAVEMENT MARKINGSQFT120
41999990MOBILIZATIONLSLUMP SUM